# Condo Services

> Reserve fund studies, performance and technical audits, equipment retrofits, generator upgrades and code compliance for Ontario condominium corporations.

A condominium corporation carries duties a rental building does not: a performance audit in its first year, a reserve fund study kept current, and emergency equipment that meets code. We prepare each one so the board can act on it.

[Request a proposal](https://www.lvg-engineering.com/contact/?service=condo-services), [or call +1 (647) 326-7684](tel:+16473267684)

**This line ends at**: Audits filed and reserves planned

## Stops on this line

The audits and studies Ontario’s Condominium Act asks of every corporation, and the generator work that keeps the building up to code.

1. **Performance audits**

   A review of the common elements of a new condominium in its first year, so deficiencies are documented while warranty coverage is still open.

2. **Reserve fund studies**

   The long-range plan for major repair and replacement. We assess the common elements and forecast what they will cost and when.

3. **Technical audits**

   A detailed engineering review of the building’s systems and their condition, reported in plain language.

4. **Equipment retrofit**

   Retrofits and upgrades of any equipment.

5. **Emergency diesel and gas generators: code upgrades and replacement**

   Emergency generators brought up to current CSA and TSSA code, or replaced when they reach the end of their service life.

6. **Code compliance and regulatory consultation**

## Start here if

- [Your reserve fund study is due](https://www.lvg-engineering.com/contact/?service=condo-services&from=Your%20reserve%20fund%20study%20is%20due)
- [Your new condo needs its performance audit](https://www.lvg-engineering.com/contact/?service=condo-services&from=Your%20new%20condo%20needs%20its%20performance%20audit)
- [The generator needs a code upgrade or replacement](https://www.lvg-engineering.com/contact/?service=condo-services&from=The%20generator%20needs%20a%20code%20upgrade%20or%20replacement)

## Good to know

- **When a reserve fund study is due**: Ontario’s Condominium Act requires every corporation to have a reserve fund study and to update it at least every three years.

- **When a performance audit happens**: The Act sets a window for it: the audit is carried out between six and ten months after the condominium is registered, and filed before the end of the eleventh month.

## Where this line connects

- **[Energy, Conservation & Sustainability](https://www.lvg-engineering.com/services/energy-conservation-sustainability/)**

  Change at Equipment retrofit for Retrofit incentives

  An equipment retrofit can qualify for Enbridge or Save On Energy incentives, so the retrofit and the incentive application are best planned together.

## From first call to finished work

1. **Listen**

   A site visit and a conversation with the building manager, the board or the owner about issues, goals, budget and timing.

2. **Investigate**

   Drawings review, site visit, review, testing and analysis of the systems and components in question.

3. **Design**

   Clear options with costs, then design and specifications for the chosen solution.

4. **Deliver**

   Tendering and contract management on site through close-out.

[Previous line Energy, Conservation & Sustainability](https://www.lvg-engineering.com/services/energy-conservation-sustainability/), [Next line Mechanical & HVAC](https://www.lvg-engineering.com/services/mechanical-hvac/)

## Start a condo services project

Tell us about the building and what is happening. An engineer will reply with next steps and a fee proposal.

[+1 (647) 326-7684](tel:+16473267684), [Request a proposal](https://www.lvg-engineering.com/contact/?service=condo-services)

---

This is the Markdown copy of https://www.lvg-engineering.com/services/condo-services/

All pages: https://www.lvg-engineering.com/llms.txt
