# Mechanical & HVAC

> Boiler, chiller, cooling tower, fan coil, heat pump and makeup air replacement and retrofit design for condos and buildings in the Greater Toronto Area.

Boilers, chillers, pumps and air handlers each wear out on their own schedule. We assess the equipment you have, design its replacement and specify the work, so the building stays comfortable while the plant behind it is renewed.

[Request a proposal](https://www.lvg-engineering.com/contact/?service=mechanical-hvac), [or call +1 (647) 326-7684](tel:+16473267684)

**This line ends at**: Reliable heating, cooling and fresh air

## Stops on this line

Heating, cooling and ventilation plant assessed, designed and replaced, from a single boiler to a complete retrofit.

1. **Boilers, heaters and heat exchangers**

   Heating plant retrofit designed around the load the building needs.

2. **Chillers and cooling towers**

   Replacement and upgrade design for central cooling plant.

3. **Pumps and valves**

   The parts that move and control water through the system, specified to match the plant they serve.

4. **Fan coils, heat pumps and ERVs**

   The in-suite units that deliver heating, cooling and fresh air: replacement programs and retrofit designs for fan coils and heat pumps.

5. **Fresh air and makeup air units**

   The units that supply fresh air and pressurize building hallways and some common areas, replaced or upgraded to restore the airflow the building needs.

6. **Complete retrofits and replacements**

   Whole-plant projects where heating, cooling and ventilation are renewed together under one design, increasing efficiency and getting incentives when available.

## Start here if

- [Boilers, chillers or pumps fail often, are noisy or are approaching the end of their service life](https://www.lvg-engineering.com/contact/?service=mechanical-hvac&from=Boilers%2C%20chillers%20or%20pumps%20fail%20often%2C%20are%20noisy%20or%20are%20approaching%20the%20end%20of%20their%20service%20life)
- [Fan coils are leaking or failing](https://www.lvg-engineering.com/contact/?service=mechanical-hvac&from=Fan%20coils%20are%20leaking%20or%20failing)
- [Corridors are stuffy and the makeup air unit is struggling](https://www.lvg-engineering.com/contact/?service=mechanical-hvac&from=Corridors%20are%20stuffy%20and%20the%20makeup%20air%20unit%20is%20struggling)

## Where this line connects

- **[Mechanical & Plumbing](https://www.lvg-engineering.com/services/mechanical-plumbing/)**

  Change at Fan coils, heat pumps & ERVs for Risers

  Fan coils sit on the HVAC line and the risers that feed them sit on the plumbing line, so a replacement on one is best designed with the other in view.

## From first call to finished work

1. **Listen**

   A site visit and a conversation with the building manager, the board or the owner about issues, goals, budget and timing.

2. **Investigate**

   Drawings review, site visit, review, testing and analysis of the systems and components in question.

3. **Design**

   Clear options with costs, then design and specifications for the chosen solution.

4. **Deliver**

   Tendering and contract management on site through close-out.

[Previous line Condo Services](https://www.lvg-engineering.com/services/condo-services/), [Next line Mechanical & Plumbing](https://www.lvg-engineering.com/services/mechanical-plumbing/)

## Start a mechanical & HVAC project

Tell us about the building and what is happening. An engineer will reply with next steps and a fee proposal.

[+1 (647) 326-7684](tel:+16473267684), [Request a proposal](https://www.lvg-engineering.com/contact/?service=mechanical-hvac)

---

This is the Markdown copy of https://www.lvg-engineering.com/services/mechanical-hvac/

All pages: https://www.lvg-engineering.com/llms.txt
