Condo Services
A condominium corporation carries duties a rental building does not: a performance audit in its first year, a reserve fund study kept current, and emergency equipment that meets code. We prepare each one so the board can act on it.
- This line ends at
- Audits filed and reserves planned
Stops on this line
The audits and studies Ontario’s Condominium Act asks of every corporation, and the generator work that keeps the building up to code.
Performance audits
A review of the common elements of a new condominium in its first year, so deficiencies are documented while warranty coverage is still open.
Reserve fund studies
The long-range plan for major repair and replacement. We assess the common elements and forecast what they will cost and when.
Technical audits
A detailed engineering review of the building’s systems and their condition, reported in plain language.
Equipment retrofit
Retrofits and upgrades of any equipment.
Emergency diesel and gas generators: code upgrades and replacement
Emergency generators brought up to current CSA and TSSA code, or replaced when they reach the end of their service life.
Code compliance and regulatory consultation
Start here if
Good to know
- When a reserve fund study is due
- Ontario’s Condominium Act requires every corporation to have a reserve fund study and to update it at least every three years.
- When a performance audit happens
- The Act sets a window for it: the audit is carried out between six and ten months after the condominium is registered, and filed before the end of the eleventh month.
Where this line connects
Energy, Conservation & Sustainability
Change at Equipment retrofit for Retrofit incentives
An equipment retrofit can qualify for Enbridge or Save On Energy incentives, so the retrofit and the incentive application are best planned together.
From first call to finished work
Listen
A site visit and a conversation with the building manager, the board or the owner about issues, goals, budget and timing.
Investigate
Drawings review, site visit, review, testing and analysis of the systems and components in question.
Design
Clear options with costs, then design and specifications for the chosen solution.
Deliver
Tendering and contract management on site through close-out.